AL BARAKA HOSPITAL
ACCESS CONTROL AND CCTV INSTALLATION

ACCESS CONTROL AND CCTV INSTALLATION

ACCESS CONTROL AND CCTV INSTALLATION

ACCESS CONTROL AND CCTV INSTALLATION
SUNNI WAQF DIRECTORATE
AMC & REPEATER INSTALLATION The project was completed successfully, resulting in enhanced indoor voice and data performance, improved user satisfaction, and seamless 4G/5G connectivity across the customer environment.

AMC & REPEATER INSTALLATION
End-to-end Design, Supply & Installation

AMC & REPEATER INSTALLATION
End-to-end Design, Supply & Installation

AMC & REPEATER INSTALLATION
End-to-end Design, Supply & Installation
AL NASEEM VILLA
REPEATER INSTALLATION The project was completed successfully, resulting in enhanced indoor voice and data performance, improved user satisfaction, and seamless 4G/5G connectivity across the customer environment.

REPEATER INSTALLATION

REPEATER INSTALLATION

REPEATER INSTALLATION
HOORA DATA CENTER
CABLE MIGRATION & CIVIL WORKS The project involved the removal of existing fiber optic cables from the current duct infrastructure and the execution of the necessary civil works to establish new fiber routes and duct pathways. The scope included the supply, laying, splicing, and testing of approximately 800 meters of 144-core fiber optic cable, as well as 500 meters of 96-core fiber optic cable.

CABLE MIGRATION & CIVIL WORKS

CABLE MIGRATION & CIVIL WORKS

CABLE MIGRATION & CIVIL WORKS

CABLE MIGRATION & CIVIL WORKS
ROYAL GOLF CLUB
Key Deliverables: • Complete DAS design and implementation. • Multi-operator ready passive DAS infrastructure. • Fiber optic and RF distribution network. • Installation of antennas, MCMs, splitters, tappers, and associated components. • Coverage testing and optimization. • As-built drawings, walk-test reports, and iBwave documentation.

IBS-DAS PROJECT

IBS-DAS PROJECT

IBS-DAS PROJECT

IBS-DAS PROJECT
Batelco
ASSET TAGGING PROJECT We are currently executing a large-scale asset tagging and physical verification project covering more than 100,000 assets across 500+ locations including Telecom Towers, Data Centers and other IT infra.

ASSET TAGGING PROJECT

ASSET TAGGING PROJECT

ASSET TAGGING PROJECT
Batelco
EARTHING PROJECT The project involves the supply, installation, and testing of Earthing cables for 91 GSM site as, ensuring the installation is robust, complies with relevant electrical standards, and provides a low-impedance path to the ground. The Earthing system is critical for safety, protecting personnel and equipment from electrical faults, lightning strikes, and static discharge.

EARTHING PROJECT

EARTHING PROJECT